The Major Roads of Zhuhai West Zone of the GBA is about to Connect Huangmaohai Great Bridge

大湾区珠西主通道即将对接黄茅海大桥

On May 5th, at the scene of constructing Gaolangang Hub Interchange Bridge of the 2ndproject of the Hegang highway of Zhuhai. (photo by drones, Xinhua reporter Liu Dawei)

5月5日拍摄的珠海鹤港高速公路二期工程高栏港枢纽立交桥建设现场(无人机照片)。新华社记者 刘大伟

China Railway 11th Bureau’s project the Gaolangang Hub Interchange Bridge of the 2ndproject of the Hegang (Hezhou)(Gaolan) Highway of Zhuhai is about to complete, which will connect the Huangmaohai Great Bridge at the Yamen Estuary of Pearl River on land. Hegang Highway is 35 km long, which is east from the joint line of Hong Kong-Zhuhai-Macau Bridge, and west to Gaolangang of Zhuhai. The completion of the project indicates that it will become the main avenue which connects west zone of Pearl River Estuary and the core area of Guangdong-Hong Kong-Macao Greater Bay Area.

  由中铁十一局施工建设的珠海鹤(洲)(高栏)港高速公路二期工程高栏港枢纽立交桥临近竣工,即将对接珠江崖门入海口黄茅海大桥陆上引桥。鹤港高速全长35公里,东起港珠澳大桥连接线,西至珠海高栏港,项目建成后将成为珠江口西岸地区快速对接粤港澳大湾区核心区域的主通道。

On May 5th, workers are cleaning the bottom board of the mould  on the Gaolangang Hub Interchange Bridge of the 2ndproject of the Hegang Highway of Zhuhai. (photo by Xinhua reporter Liu Dawei)

5月5日,工人在珠海鹤港高速公路二期工程高栏港枢纽立交桥清洗模板底板。新华社记者 刘大伟 摄On May 5th, at the scene of constructing Gaolangang Hub Interchange Bridge of the 2ndproject of the Hegang Highway of Zhuhai. (photo by drones, Xinhua reporter Liu Dawei)

5月5日拍摄的珠海鹤港高速公路二期工程高栏港枢纽立交桥建设现场(无人机照片)。新华社记者 刘大伟 摄